Key Construction  /  Formcode  /  Post-Launch Baseline

Post-Launch
Baseline Report

Your new site went live on August 14 and it does its job. Sixty-four projects, ten market sectors, five services, four named clients on record, fast and secure on every device. It speaks for itself.

What this document is

This is a baseline. It records where things stand thirteen days after launch so that a year from now we can put the same measurements side by side and show you exactly what changed. Nothing in it is a problem report and nothing in it requires action.

It comes in three parts. Section 1 is the baseline itself, the numbers we will re-read next August. Section 2 is a set of observations about how Key Construction appears on platforms you do not own, each one optional. Section 3 is the ongoing work that would keep those things accurate over time.

If you want to skip to the useful part: the items marked Suggested are the four we would start with, and every one of them is cheap, quick, and independent of the others.

Prepared for Ayman
Prepared by Formcode
Launched Aug 14, 2026
Readings taken Aug 27, 2026
01

The Baseline

Two groups. The first is the site we built, which is complete and holding. The second is everything measured outside the site, on platforms Key Construction does not control. Several of those numbers sit at or near zero, which is simply what a thirteen day old search footprint looks like, and is exactly why it is worth recording today. Nothing in the second group needs attention. It is here to be measured again next August.

The site we built Complete and holding
Solid
Site live and secure
200 on HTTPS, CDN in front
Built
Solid
Project archive published
64 project pages live
Built
Solid
Service and market coverage
5 services, 10 market sectors
Built
Solid
Named client proof on site
4 references, with titles
Built
Measured outside the site Recorded today, re-read next August
Open
Company name in public records
3 variants in circulation
Open
AI assistants naming you correctly
0 of the checks we ran
Open
Google reviews
2, rated 5.0
Open
Google profiles per office
1 of 2 (Toledo: none we can see)
Open
Map pack appearances
None recorded
Open
Phone and address in directories
3 phone numbers, 3 addresses
Open
Buyer search for a SE Michigan GC
Not on page one, 5 competitors are
Open
Search terms the site ranks for
4, nationally
Open
Pages earning any search traffic
2 of 88 published
Watch
Newest article
March 27, 2025
Watch
Depth per project page
64 pages, roughly 150 words each
Open
Employer record where candidates look
7 roles open, 0 profiles we can see
Watch
Prequalification path for subs and owners
Bid portal only, no packet on site
Open
Company pages on LinkedIn and YouTube
0 of 2 found
Solid: complete and holding Watch: accurate today, drifts over time Open: not currently owned by anyone
02

Additional Observations

Eleven observations, taken the way an owner, an architect, a subcontractor, or a candidate would see Key Construction before they ever reach your site. Every one of them lives on a platform you do not control: Google, the trade directories, the job boards, the AI assistants. None of it is broken and none of it is urgent. Each observation ends in a question rather than a recommendation, because the answer is yours and it decides whether the work is worth doing. Four are marked Suggested. Those are the ones we would do first.

□
How to use this section

These are points of inquiry, not a task list. Tick anything you would like to talk through, then use the button at the bottom to send us the list. We come back with a scope and a price for those items only. Ticking something is not a commitment to do it.

03

Further Enhancements

The observations above are one-off corrections. These four are ongoing: they keep the record accurate as it drifts and produce the data next August's report is measured against. Each one names the observations it covers.

Ongoing programs Optional, priced monthly
04

Suggested Sequence

If you took everything in sections 2 and 3, this is the order we would run it. Cheap and visible first, compounding work after. Whatever you actually select, we build the schedule around that instead. Month twelve is fixed either way: that is next August's report, measured against the baseline in section 1.

Phase
1
2
3
4
5
6
7
8
9
10
11
12

Correct the records

One name, one phone number, both offices listed.

F-01, F-04, F-05

Build reviews

Ask the clients who already went on record.

F-03 review program

Expand the content

Markets, projects, and prequalification pages.

F-06, F-08, F-10

Maintain it

Articles, LinkedIn, recruiting, and monitoring.

F-02, F-07, F-09, F-11

Next annual report

Same measurements, a year of data behind them.

Aug
▼ Aug 2026, launchAug 2027, next report ▼
05

How This Works

No package

You are not buying a bundle. We scope only what you check, and we will tell you plainly which items are worth it and which can wait.

Nothing is required

The site is finished and it stands on its own. Everything here is optional, and doing none of it is a legitimate answer.

This repeats

This report measures the starting line. Next August we bring the same page back with a year of data on it, whether or not you select anything today.

06

What Was Delivered

The completed build, listed once so the record is whole. Delivered, paid in full, and closed. Nothing in this section requires anything from you.

Delivered August 14, 2026 Formcode
001
Site architecture
24 core pages plus a 64 entry project archive, replatformed and live on buildwithkey.com.
Complete
002
Service pages
General contracting, design-build, construction management, pre-construction, multi-site programs.
Complete
003
Market sector pages
Ten sectors, from water and wastewater through data centers, each with filtered project results.
Complete
004
Project archive
64 completed projects published with photography and sector filtering.
Complete
005
About, Careers, and News
Company story, recruiting content covering field and office roles, and the article archive.
Complete
006
Inquiry paths
Start a Project and Contact forms, phone and email on every page, both offices published.
Complete
007
Plan Room routing
Bid access routed to your BuildingConnected portal.
Complete
008
Client proof
Four named client references published with organization and title.
Complete
009
Launch and handover
DNS cutover, HTTPS, CDN, page metadata, sitemap submission, and post-launch monitoring.
Complete

The expensive part is behind you and it came out well. Everything else in this report is small, optional, and lives outside the site: the profiles, the listings, the records, and the answers other platforms give about you. Tick whatever you would like to discuss and send it over. Either way we will be back next August with this same report and a year of data on it.

Formcode Strategic Digital Growth Partner since 2000 [email protected] (248) 733-3368